Close Menu
  • Instructions
  • News
    • DeFi
    • Smart Contract
    • Markets
    • Web3
    • Adoption
    • Memecoins
    • Analysis
    • Mining
    • Scams
    • Security
  • Education
    • Learn
    • Wallets & Exchange
  • Documentaries
  • Videos
    • Alessio Rastani
    • Altcoin Buzz
    • Coin Bureau
    • Dapp University
    • DataDash
    • Digital asset News
    • EllioTrades Crypto
    • MMCrypto
    • Lark Davis
    • Ivan on Tech
    • Benjamin Cowen
  • Market
    • Crypto Market Cap
    • Heat Map
    • Converter
    • Metal Prices
    • Stock prices
  • Bonus Books
  • Tools
What's Hot

Malaysia seized 75,000 mining rigs. The grid wars are real

July 21, 2026

Across, Allbridge, TeleSwap lost $5.7M to bridge hacks in past week

July 21, 2026

Augustus raises $180 million to build a clearing bank for the AI and stablecoin era

July 21, 2026
Facebook X (Twitter) Instagram
Recession Profit AlertsRecession Profit Alerts
  • Instructions
  • News
    • DeFi
    • Smart Contract
    • Markets
    • Web3
    • Adoption
    • Memecoins
    • Analysis
    • Mining
    • Scams
    • Security
  • Education
    • Learn
    • Wallets & Exchange
  • Documentaries
  • Videos
    • Alessio Rastani
    • Altcoin Buzz
    • Coin Bureau
    • Dapp University
    • DataDash
    • Digital asset News
    • EllioTrades Crypto
    • MMCrypto
    • Lark Davis
    • Ivan on Tech
    • Benjamin Cowen
  • Market
    • Crypto Market Cap
    • Heat Map
    • Converter
    • Metal Prices
    • Stock prices
  • Bonus Books
  • Tools
Recession Profit AlertsRecession Profit Alerts
Home»Mining»Bitdeer Breaks Ground on 100 MW Alberta Site With on-Site Gas Power
Mining

Bitdeer Breaks Ground on 100 MW Alberta Site With on-Site Gas Power

June 4, 2026No Comments4 Mins Read

This article first appeared in The Energy Mag. The original article can be viewed here. The Energy Mag (formerly The Miner Mag) provides news, data, and insights on the energy–compute–markets nexus.

The company said Tuesday it broke ground near Fox Creek on a site that will combine a 101 megawatt natural gas-fired power plant with a data center offering about 100 MW of computing capacity. The project represents a $155 million investment, or about C$214 million, and is expected to be energized in the second quarter of 2027.

Bitdeer said the facility will initially support bitcoin mining while retaining the flexibility to host future high-performance computing workloads, including AI applications. That positioning is notable as miners seek to preserve near-term cash flow from bitcoin production while designing new sites with enough power density and infrastructure optionality to appeal to AI and HPC tenants.

The Fox Creek project is being developed under Alberta’s bring-your-own-generation framework. Instead of drawing operating electricity from the grid, the data center is designed to be powered directly by the on-site gas plant in a behind-the-fence configuration. The plant will remain connected to the Alberta Electric System Operator grid through an approved 99 MW interconnection, giving the site the ability to curtail computing workloads and send electricity back to the grid during peak demand or system stress.

That structure addresses one of the central tensions surrounding new data-center development: how to add large, power-hungry computing loads without worsening grid constraints or shifting costs to other customers. In several US power markets, including PJM, rapid data-center growth has become a flashpoint as grid operators and regulators debate whether large loads should be required to bring new generation or accept curtailment obligations.

See also  Bitcoin Has a Built-In Price Floor Driven by Energy Costs

Bitdeer’s Alberta site follows that broader industry shift toward co-locating power supply and compute demand. For bitcoin miners, the model has a dual purpose. Mining provides an immediately deployable, flexible load that can use available generating capacity from the first day of energization. At the same time, the underlying infrastructure can be designed for higher-value compute use cases if AI demand, fiber access, cooling requirements and customer contracts line up.

The project also deepens Bitdeer’s exposure to North American energy infrastructure at a time when the company is expanding beyond its role as a bitcoin miner and mining-equipment manufacturer. Bitdeer acquired the fully licensed and permitted Fox Creek site in February 2025 from a project originally developed by Kiwetinohk Energy Corp. and approved by the Alberta Utilities Commission. The company said the site is moving into construction after years of permitting, engineering, environmental review, regulatory approvals and consultations with local governments and First Nations.

The 7.7-hectare site, located about 1.5 kilometers from Fox Creek in the Municipal District of Greenview No. 16, is expected to create about 300 construction jobs and 30 permanent positions. Bitdeer said it will prioritize Alberta-based contractors and local hiring for operational roles.

The company said the facility will use a closed-loop dry-cooling system with no water withdrawal from nearby bodies of water. It also plans to deploy a system to capture and utilize carbon dioxide emissions from on-site power generation, which Bitdeer said is intended to reduce the project’s carbon intensity and offset applicable carbon obligations under Canadian regulations.

“Today’s groundbreaking marks the beginning of our long-term presence in Canada,” Chairman and Chief Executive Officer Jihan Wu said in the statement. He said Alberta and Fox Creek offer a combination of regulatory confidence, energy resources, openness to industrial investment and skilled labor.

See also  Cango Completes $442M Bitcoin Liquidation and Secures $75M in New Capital for AI Pivot

The project arrives as Alberta seeks to attract AI data-center investment by promoting its natural- gas resources, deregulated power market and industrial development framework. Premier Danielle Smith said in the announcement that the province’s gas supply and power-industry capacity make Alberta a competitive destination for AI data centers.

For Bitdeer, the construction start turns Fox Creek from a permitted power asset into a live development project. The company’s challenge now will be execution: bringing the gas plant and data center online by 2027, maintaining environmental and regulatory compliance, and proving that a mining-first site can retain enough technical flexibility to capture future AI and HPC demand.

This article first appeared in The Energy Mag. The original article can be viewed here. The Energy Mag (formerly The Miner Mag) provides news, data, and insights on the energy–compute–markets nexus.

Source link

Alberta Bitdeer Breaks Gas Ground onSite power site

Related Posts

Malaysia seized 75,000 mining rigs. The grid wars are real

July 21, 2026

Dogecoin Co-Founder Slams Ending Merge Mining

July 21, 2026

LM Funding America Rebrands as PowerCompute, Shifts Focus to AI and HPC Infrastructure

July 21, 2026

Hut 8 surges on $9.8 billion AI data-center lease, lifting compute sector

July 20, 2026
Top Posts

Crypto Hackers Can Now Steal Password From Your Camera Roll

April 6, 2026

Wi-Fi Market Forecast to Reach USD 90.65 Billion by 2033

February 9, 2026

Education Is Key To Tackling Increasing Trend of Crypto Hacks

October 31, 2023

Type above and press Enter to search. Press Esc to cancel.