Close Menu
  • Instructions
  • News
    • DeFi
    • Smart Contract
    • Markets
    • Web3
    • Adoption
    • Memecoins
    • Analysis
    • Mining
    • Scams
    • Security
  • Education
    • Learn
    • Wallets & Exchange
  • Documentaries
  • Videos
    • Alessio Rastani
    • Altcoin Buzz
    • Coin Bureau
    • Dapp University
    • DataDash
    • Digital asset News
    • EllioTrades Crypto
    • MMCrypto
    • Lark Davis
    • Ivan on Tech
    • Benjamin Cowen
  • Market
    • Crypto Market Cap
    • Heat Map
    • Converter
    • Metal Prices
    • Stock prices
  • Bonus Books
  • Tools
What's Hot

India Busts ₹226 Crore Crypto Network Linked to Drugs and Terror Financing

May 23, 2026

Bitcoin heads higher as President Trump announces Iran peace agreement

May 23, 2026

Aave and MetaMask Launch DeFi Payment Feature for Spending Yield-Bearing Assets

May 23, 2026
Facebook X (Twitter) Instagram
Recession Profit AlertsRecession Profit Alerts
  • Instructions
  • News
    • DeFi
    • Smart Contract
    • Markets
    • Web3
    • Adoption
    • Memecoins
    • Analysis
    • Mining
    • Scams
    • Security
  • Education
    • Learn
    • Wallets & Exchange
  • Documentaries
  • Videos
    • Alessio Rastani
    • Altcoin Buzz
    • Coin Bureau
    • Dapp University
    • DataDash
    • Digital asset News
    • EllioTrades Crypto
    • MMCrypto
    • Lark Davis
    • Ivan on Tech
    • Benjamin Cowen
  • Market
    • Crypto Market Cap
    • Heat Map
    • Converter
    • Metal Prices
    • Stock prices
  • Bonus Books
  • Tools
Recession Profit AlertsRecession Profit Alerts
Home»Mining»Applied Digital Tops 1 GW as AI Factory Campus Locks $7.5B Hyperscaler Lease
Mining

Applied Digital Tops 1 GW as AI Factory Campus Locks $7.5B Hyperscaler Lease

May 22, 2026No Comments3 Mins Read

Applied Digital has signed a 15-year, take-or-pay lease at its fourth artificial intelligence (AI) Factory campus, Polaris Forge 3, with the same U.S.-based investment-grade hyperscaler that signed at Delta Forge 1 in April 2026.

  • Key Takeaways:

  • Applied Digital signs a 15-year, $7.5B lease at Polaris Forge 3, pushing total contracted revenue to $31B.
  • APLD now holds 1,200 MW of contracted AI capacity across 4 campuses, with 65% backed by investment-grade hyperscalers.
  • Polaris Forge 3 is set to begin operations in August 2027, with APLD actively marketing 1.7 GW of additional power.

Applied Digital Pushes Total Contracted Revenue to $31B With Fourth AI Campus Deal

Applied Digital Corp. (Nasdaq: APLD), the Dallas-based artificial intelligence (AI) infrastructure provider, bitcoin miner and data center developer, announced the agreement May 20, 2026. The deal covers 300 megawatts of critical IT load at Polaris Forge 3, a campus located in a northern state and supported by approximately 430 MW of grid-connected utility power.

The lease carries a base-term value of approximately $7.5 billion and up to $18.2 billion if all renewal options are exercised.

The release details that the agreement brings Applied Digital‘s total contracted lease revenue to $31 billion across four AI Factory campuses, or $73 billion including all renewal options. Total contracted critical IT load now stands at 1,200 MW net, with approximately 1,670 MW of gross utility power. About 65% of that contracted revenue is backed by U.S.-based investment-grade hyperscalers.

APLD market year-to-date via bitcoinminingstock.io on May 21, 2026.

Wes Cummins, chairman and chief executive officer of Applied Digital, called the deal a continuation of a proven framework. “This second 300 MW lease with the same U.S.-based high investment-grade hyperscaler we partnered with at Delta Forge 1 reflects the confidence we’ve built through disciplined execution and our ability to consistently advance large-scale AI infrastructure projects,” Cummins explained.

See also  Finland works on instant payments system, embraces digital euro

The company has executed leases representing 1.2 GW of capacity in 11 months. Cummins added that Applied Digital is actively marketing more than 1.7 GW of additional grid-connected utility power across recently added and existing sites.

Polaris Forge 3 covers more than 600 acres and is engineered for high-density AI workloads. The campus uses Applied Digital’s proprietary waterless cooling technology, high-density power delivery, and advanced liquid-cooling architecture. Operations are expected to begin in August 2027.

The campus follows the same AI Factory model applied at Polaris Forge 1, Polaris Forge 2, and Delta Forge 1. Applied Digital describes the model as repeatable and purpose-built to support large-scale AI training and inference infrastructure at the compute densities demanded by next-generation systems.

Applied Digital is one of many bitcoin mining operators that has transitioned to mostly AI infrastructure products and high-performance computing (HPC) workloads. Over the last five days, APLD shares have risen 6.8% and year-to-date, the stock is up more than 85%.

Source link

7.5B Applied Campus Digital Factory Hyperscaler Lease Locks tops

Related Posts

Bitdeer Sells 201.6 BTC This Week, Continues Liquidation Strategy

May 23, 2026

Glider Adds Solana Lending On Crypto Portfolio Management Platform, Providing On-Chain Credit Opportunities To Digital Asset Audience

May 23, 2026

Canaan earnings show Q1 revenue collapse as record BTC and ETH treasury nears $148M

May 22, 2026

84% of BTC hashrate secured Bitcoin DeFi in Q1, but miners saw little fee upside

May 21, 2026
Top Posts

Template Injection Attacks: Nefarious Actors Lie in Wait in North Korea

October 11, 2023

Sam Altman (CEO of OpenAI) And Joe Rogan (CEO of Cold Plunges & Elk Meat) Are Bitcoin Bulls?

October 11, 2023

Cambodia’s new anti-cybercrime law imposes up to life in prison for scam center operators if a victim dies

April 5, 2026

Type above and press Enter to search. Press Esc to cancel.